Testing and Training

We provide testing, training and offshore support to ensure our end-users are informed and confident with our products.

Product Verification Testing

All of our products undergo verification testing in order to verify the suitability of the design against the project-specific criteria.

  • 1:10 and 1:1 product samples
  • Full-scale interface mock-up
  • MBR and stiffness checks
  • Installation trials
  • Surveys at the foundation fabrication yard

Product Training

Product training is offered to all offshore teams prior to mobilisation in order to familiarise personnel and reduce time and risk offshore.

  • Unloading and preparing system
  • Assembly and set up full-scale interface mock-up
  • Pull-in into mock-up installation
  • Review of past lessons learned

Wet Trials

As an extension to Product Verification Testing and Product Training, Tekmar Energy can conduct offshore wet trails of the system in a simulated subsea environment.

  • Simulated seabed and scour protection
  • Performed in a floodable dry-dock facility
  • Product training program
  • Installation trial with project cable

Offshore Support

Following mobilisation, Tekmar Energy will send a dedicated engineer offshore to support with the initial installation.

  • Flexible support around client requirements
  • 24/7 call-out support
  • On-board inductions and training
  • Fully GWO trained staff
  • Offshore wind experience from over 85 projects.